We are currently installing new doors in the stairwell in Lauinger Library. During this time, visitors will not be able to use landings that are under construction, either to enter that floor or pass through en route to another. We encourage visitors to use the elevators, although the stairwell may still be used to access floors that are not under construction. Landings under construction should only be used in the case of an emergency.

Search Google Scholar

or browse databases: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z #

You are here

Search

Research

Services

Libraries & Spaces

About

Information for:

You are here

Borrowing Government Documents

Georgetown Users

  Limitations Loan Period
Undergraduate Students Unlimited 4 weeks
Graduate Students Unlimited 1/15; 9/15
Tenure, tenure-track, and retired faculty Unlimited 1/31/2017
Adjunct, visiting, part-time faculty, and graduate lecturers Unlimited 5/31/2016
University Staff Unlimited 4 weeks
Postdoctorate & Affiliated Researchers Unlimited 4 weeks
Alumni & Library Associates Maximium of 6 6 weeks
Medstar Staff Unlimited 4 weeks
Continuing Education Students Unlimited 4 weeks

*  All government documents are subject to recall after four weeks if requested by another borrower, after two weeks if needed for Course Reserves.

Consortium Users

  Limitations Loan Period
WRLC Students Unlimited 4 weeks
WRLC Faculty Unlimited 1/31; 5/31; 9/30
WRLC Staff Unlimited 4 weeks
CIRLA Faculty & Graduate Students Maximum of 6 6 weeks

 

Other Borrowers

  Limitations Loan Period
Non-Georgetown Affiliated Faculty & College Students Library use only N/A
Library Visitors Library use only N/A
Corporate Borrowing Not Allowed N/A